APPROVED DATE: 5/31/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-1979
|
JOB ADDRESS: 2454 MERRIMAC DRIVE FRISCO, TX |
DESC:
3874 AC, 4504 SF, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
CONTRACTOR:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
ISSUED DATE: 6/5/2006
APPLIED DATE:5/17/2006
EXPIRED DATE:12/4/2006
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 289039.14
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
INSULATION 8/30/06 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
THOROUGHFARE IMPACT FEE | $2,242.00 |
WATER IMPACT FEE | $388.00 |
SEWER IMPACT FEE | $523.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 7/31/06 | $30.00 |
PLUMBING TOP OU 8/2/06 | $30.00 |
PLUMBING TOP OU 8/3/06 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $135.12 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,943.75 |
FENCE FEE | $20.00 |
CO/BUILDING FIN 10/19/06 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
REPLACEMENT CARD FEE | $10.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
Total Fees: | $6,313.87 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|