CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/27/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-1943
JOB ADDRESS:
3556 BLOOMFIELD LANE
FRISCO, TX
DESC:   4399 AC, 5102 SF, SFR / 2 STORY
OWNER:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #200
IRVING TX 75038

CONTRACTOR:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #200
IRVING TX 75038
ISSUED DATE:
6/2/2006
APPLIED DATE:
5/16/2006
EXPIRED DATE:
12/1/2006
SITE APN:
STATUS:
COMPLETED
APPLICANT:
DREES CUSTOM HOMES X-05/03
6051 STATE HIGHWAY #200
IRVING TX 75038
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
328209.39
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING FINAL 11/17/06$30.00
CONVENIENCE FEE$1.80
CONVENIENCE FEE$2.70
CONVENIENCE FEE$2.70
CONVENIENCE FEE$1.80
CONVENIENCE FEE$0.90
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLUMBING TOP OU 9/15/06$30.00
CO/BUILDING FINAL 1/26/2007$30.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
LAWNSPRINKLERSYSTEM$35.00
WATER USAGE ON NON FUNCTIONAL$500.00
ELECTRICAL FINA 11/17/06$30.00
RESIDENTIAL ELECTRIC FEE$153.06
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$253.00
BUILDING PERMIT FEE$2,138.75
FENCE FEE$20.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
Total Fees:$3,940.71
______  METER PAYMENT
______  T-POLE
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  SLAB
______  CAMERA
______  WATER REGISTER
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)