BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 6/27/2006
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B06-1916
|
JOB ADDRESS: 11811 CUSTER RD FRISCO, TX 75035 |
DESC:
7018 SQ FT, CNEW / CAPITAL ONE BANK (formerly hibernia bank) |
|
OWNER:
Hibernia National Bank
225 Baronne St. New Orleans LA 70112
|
CONTRACTOR:
RATCLIFF CONSTRUCTORS
14901 QUORUM DR STE. 715 DALLAS TX 75234
|
ISSUED DATE: 7/27/2006
APPLIED DATE:5/15/2006
EXPIRED DATE:2/3/2018
SITE APN:C2635969
STATUS:COMPLETED
|
|
APPLICANT:
OGLESBY HOLTMAN DESIGN
2261 BROOKHOLLOW PLAZA DR #106 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 1600000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
CEILING 8/8/2007 GDS | $35.00 |
WATER METER DEPOSIT | $75.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
2 INCH PD METER | $490.00 |
THOROUGHFARE IMPACT FEE | $66,524.00 |
WATER IMPACT FEE | $2,266.00 |
SEWER IMPACT FEE | $1,079.00 |
MISCELLANEOUS ELECTRICAL FEES | $498.60 |
MISCELLANOUS MECHANICAL FEES | $285.70 |
MISCELLANEOUS PLUMBING FEES | $280.00 |
COMMERCIAL BUILDING PERMIT FEE | $4,501.14 |
Total Fees: | $76,434.44 |
|
|
| ______ T-POLE |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ ELECTRICAL |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ CAMERA |
______ CAMERA |
______ CAMERA |
______ SEWER |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ PAVING |
______ BRICK/WALL TIES |
______ MISCFRAME |
______ MECHANICAL |
______ ELECTRICAL |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL |
______ MISCFRAME |
______ MISCFRAME |
______ ELECTRICAL |
______ COMM PLUMB TOP OUT |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL |
______ ELECTRICAL |
______ ELECTRICAL |
______ FLATWORK |
______ MECHANICAL |
______ FLATWORK |
______ ELECTRICAL |
______ METER PAYMENT |
______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 2 PD METER |
______ ELECTRICAL RELEASE |
______ ELECTRICAL RELEASE |
______ CEILING |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CEILING |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ MISCCO |
______ COMM CO |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|