BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/27/2006
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B06-1783
|
JOB ADDRESS: 5858 MAIN ST FRISCO, TX 75033 |
DESC:
54574 SQ FT, CNEW / MAIN STREET AND WORLD CUP WAY |
|
OWNER:
Main Dallas Parkway Crossing,
8235 Douglas Ave, #950 Dallas TX 75225
|
CONTRACTOR:
CMG COMMERCIAL CONTRACTING INC
2175 MANANA #100 DALLAS TX 75220
|
ISSUED DATE: 10/26/2006
APPLIED DATE:5/8/2006
EXPIRED DATE:4/25/2006
SITE APN:C2657439
STATUS:COMPLETED
|
|
APPLICANT:
O'BRIEN & ASSOCIATES
5310 HARVEST HILL RD DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 2750000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
SET 2 TURB METER 9/12/2007 B | $30.00 |
CREDIT CARD FEE | $0.90 |
CONVENIENCE FEE | $1.05 |
SEWER IMPACT FEE | $12,426.70 |
THOROUGHFARE IMPACT FEE | $302,406.00 |
WATER IMPACT FEE | $30,576.00 |
COMMERCIAL BUILDING PERMIT FEE | $6,674.64 |
COMMERCIAL ELECTRIC FEE | $2,202.96 |
MISCELLANEOUS PLUMBING FEES | $244.00 |
MISCELLANOUS MECHANICAL FEES | $105.20 |
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $490.00 |
WATER METER DEPOSIT | $75.00 |
2 INCH TURB METER | $615.00 |
ELECTRICAL FINAL 9/4/2007 JB | $35.00 |
SEWER IMPACT FEE | $0.30 |
ILLEGAL JUMPER | $500.00 |
PLUMBING ROUGH- 1/10/07 | $35.00 |
Total Fees: | $356,527.75 |
|
|
| ______ ELECTRICAL |
______ PIER |
______ ELECTRICAL |
______ MISC SLAB |
______ MISC SLAB |
______ ELECTRICAL ROUGH IN |
______ ELECTRICAL |
______ PRE POUR INSP |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ MISC SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ ELECTRICAL ROUGH IN |
______ T-POLE |
______ SLAB |
______ T-POLE |
______ PAVING |
______ SLAB |
______ SLAB |
______ CAMERA |
______ MECHANICAL |
______ COMMDRYWALL |
______ BRICK |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ ELEC WALL |
______ ELEC WALL |
______ ELECTRICAL |
______ INSULATION |
______ MISCFRAME |
______ DRY WALL |
______ INSULATION |
______ CEILING |
______ CEILING |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL |
______ ELECTRICAL RELEASE |
______ CEILING |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ METER PAYMENT |
______ METER PAYMENT |
______ SET 2 PD METER |
______ SET 2 TURB METER |
______ SET 2 TURB METER |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ FIRE FINAL |
______ FIRE FINAL |
______ MISCCO |
______ MISCCO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|