|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/15/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-1769
|
JOB ADDRESS: 4118 GEORGIAN TRAIL FRISCO, TX |
DESC:
*EXPIRED*5090 AC, 6303 SF, SFR / 2 STORY |
|
OWNER:
CITELLI CUSTOM HOMES
2975 BELCLAIRE DR. FRISCO TX 75034
|
CONTRACTOR:
CITELLI CUSTOM HOMES
2975 BELCLAIRE DR. FRISCO TX 75034
|
ISSUED DATE: 5/16/2006
APPLIED DATE:5/8/2006
EXPIRED DATE:6/21/2007
SITE APN:
STATUS:EXPIRED PERMIT
|
|
APPLICANT:
CITELLI CUSTOM HOMES
2975 BELCLAIRE DR. FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 379764.9
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-HEAT 12/1/06 | $30.00 |
CONVENIENCE FEE | $3.60 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,393.75 |
MISCELLANEOUS PLUMBING FEES | $305.00 |
MISCELLANOUS MECHANICAL FEES | $175.50 |
RESIDENTIAL ELECTRIC FEE | $189.09 |
Total Fees: | $3,571.94 |
|
|
| ______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ LATH |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ T-HEAT |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|