Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 4/8/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-1214
JOB ADDRESS:
12532 LITTLEFIELD DR
FRISCO, TX 75035
DESC:   2921 AC, 3536 SF, SFR / 2 STORY
OWNER:
BUESCHER HOMES
1445 MACARTHUR DR. #100
CARROLLTON TX 75007

CONTRACTOR:
BUESCHER HOMES
1445 MACARTHUR DR. #100
CARROLLTON TX 75007
ISSUED DATE:
4/17/2006
APPLIED DATE:
3/31/2006
EXPIRED DATE:
10/16/2006
SITE APN:
C2554315
STATUS:
COMPLETED
APPLICANT:
BUESCHER HOMES
1445 MACARTHUR DR. #100
CARROLLTON TX 75007
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
217935.81
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING FINAL 9/7/06$30.00
LAWNSPRINKLERSYSTEM$35.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
1 INCH METER$290.00
WATER METER DEPOSIT$75.00
FENCE FEE$20.00
BUILDING PERMIT FEE$1,583.75
MISCELLANEOUS PLUMBING FEES$232.00
MISCELLANOUS MECHANICAL FEES$123.00
RESIDENTIAL ELECTRIC FEE$106.08
Total Fees:$2,554.83
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)