BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 3/30/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-1018
|
JOB ADDRESS: 13917 BADGER CREEK DRIVE FRISCO, TX |
DESC:
3572 AC, 4032 SF, SFR / 2 STORY |
|
OWNER:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
CONTRACTOR:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
ISSUED DATE: 4/10/2006
APPLIED DATE:3/16/2006
EXPIRED DATE:10/9/2006
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
FIRST TEXAS HOMES
2221 E LAMAR #960 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 266506.92
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
RESIDENTIAL ELECTRIC FEE | $120.96 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,828.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OUT 6/7/2006 PD | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 8/23/06 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
Total Fees: | $2,814.71 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ FLATWORK |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|