Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 3/29/2006 PERMIT SUB-TYPE: SNEW PERMIT NO: B06-0697
JOB ADDRESS:
10065 PLAINSMAN LN
FRISCO, TX 75035
DESC:   4618 AC, 5291 SF, SFR / 2 STORY
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206

CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
ISSUED DATE:
3/30/2006
APPLIED DATE:
3/29/2006
EXPIRED DATE:
9/29/2006
SITE APN:
C2537290
STATUS:
COMPLETED
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE
DALLAS TX 75206
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
344548.98
FEE SUMMARY
INSPECTION SUMMARY
REPLACEMENT CARD FEE$10.00
PLUMBING FINAL 8/30/06$30.00
PLUMBING FINAL 9/1/06$30.00
RESIDENTIAL RED TAG FEE$30.00
RESIDENTIAL RED TAG FEE$30.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
PLUMBING ROUGH-IN 4/24/2006$30.00
PLAN REVIEW FEE$50.00
PLUMBING TOP OU 7/3/2006$30.00
PLUMBING TOP OU 7/5/2006$30.00
PLUMBING TOP OU 7/7/2006$30.00
LAWNSPRINKLERSYSTEM$35.00
RESIDENTIAL ELECTRIC FEE$158.73
MISCELLANOUS MECHANICAL FEES$136.00
MISCELLANEOUS PLUMBING FEES$274.00
BUILDING PERMIT FEE$2,218.75
FENCE FEE$20.00
MISCELLANEOUS BUILDING PERMIT$10.00
Total Fees:$3,517.48
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  CAMERA
______  T-POLE
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  BRICK/WALL TIES
______  DRY WALL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)