APPROVED DATE: 3/22/2006 PERMIT SUB-TYPE: CNEW PERMIT NO: B06-0536
JOB ADDRESS:
6175 MAIN ST
FRISCO, TX 75034
DESC:   67457 SQ FT, CNEW / FRISCO SQUARE BLDG F1-1
OWNER:
BHFS III LLC
16250 DALLAS PKWY #101
DALLAS TX 75248-2622

CONTRACTOR:
HC BECK, LTD
1807 ROSS AVE, STE. 500
DALLAS 75201
ISSUED DATE:
3/31/2006
APPLIED DATE:
2/7/2006
EXPIRED DATE:
12/31/2007
SITE APN:
C2567548
STATUS:
COMPLETED
APPLICANT:
HC BECK, LTD
1807 ROSS AVE, STE. 500
DALLAS 75201
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
6800000
FEE SUMMARY
INSPECTION SUMMARY
WATER METER DEPOSIT$75.00
2 INCH PD METER$490.00
MISCELLANEOUS ELECTRICAL FEES$1,619.14
MISCELLANOUS MECHANICAL FEES$638.65
MISCELLANEOUS PLUMBING FEES$609.00
COMMERCIAL BUILDING PERMIT FEE$14,329.14
Total Fees:$17,760.93
______  ELECTRICAL
______  PIER
______  PIER
______  T-POLE
______  MISC SLAB
______  FOOTINGS
______  MISC SLAB
______  FOOTINGS
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  ELECTRICAL
______  FOOTINGS
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  ELECTRICAL
______  SEWER
______  FLATWORK
______  FLATWORK
______  FLATWORK
______  COMM SLAB
______  COMM SLAB
______  COMM FRAME
______  BRICK/WALL TIES
______  ROOF DRAINS
______  ELECTRICAL
______  COMM PLUMB TOP OUT
______  COMM FRAME
______  WATER
______  ELECTRICAL
______  INSULATION
______  FLATWORK
______  ELECTRICAL
______  COMM FRAME
______  COMM PLUMB TOP OUT
______  BRICK/WALL TIES
______  MISCFRAME
______  BRICK/WALL TIES
______  ELECTRICAL ROUGH IN
______  ELEC WALL
______  COMM FRAME
______  BRICK/WALL TIES
______  INSULATION
______  ELEC WALL
______  COMM FRAME
______  INSULATION
______  DRY WALL
______  ELECTRICAL RELEASE
______  DRY WALL
______  ELECTRICAL RELEASE
______  MECHANICAL
______  ELECTRICAL
______  INSULATION
______  METER PAYMENT
______  SET 2 PD METER
______  MECHANICAL
______  ELECTRICAL
______  DRY WALL
______  ELECTRICAL
______  INSULATION
______  CEILING
______  CEILING
______  COMM FRAME
______  ELECTRICAL
______  COMM FRAME
______  MECHANICAL
______  ELECTRICAL
______  CEILING
______  MECHANICAL
______  ELECTRICAL
______  MECHANICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  SIDEWALK
______  FIRE FINAL
______  MECHANICAL FINAL
______  BUILDING FINAL
______  FIRE FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)