BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/16/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-0469
|
JOB ADDRESS: 5400 SPICEWOOD LN FRISCO, TX 75034 |
DESC:
7985 AC, 10427 SF, SFR / 2 STORY |
|
OWNER:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
CONTRACTOR:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
ISSUED DATE: 3/22/2006
APPLIED DATE:2/16/2006
EXPIRED DATE:9/21/2006
SITE APN:C2037459
STATUS:COMPLETED
|
|
APPLICANT:
GEORGE C FULLER CONTRACTING X-
2405 PROVINE RD MCKINNEY TX 75070
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 550771.02
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
REPLACEMENT CARD FEE | $10.00 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $0.90 |
CREDIT CARD FEE | $0.90 |
CAMERA 5/11/2006 CB | $30.00 |
CAMERA FAILED | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH- 4/12/2006 | $30.00 |
PLUMBING ROUGH- 4/17/2006 | $30.00 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $0.90 |
PLUMBING FINAL 8/6/2007 | $30.00 |
2NDS/FRAMING 9/5/06 | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $312.81 |
MISCELLANOUS MECHANICAL FEES | $219.50 |
MISCELLANEOUS PLUMBING FEES | $337.00 |
BUILDING PERMIT FEE | $3,476.00 |
FENCE FEE | $20.00 |
T-HEAT 5/30/2007 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
SET 1 PD METER 4/4/2006 RGH | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
CREDIT CARD CONVENIENCE FEE | $1.80 |
ELECTRICAL FINA 6/1/2007 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
Total Fees: | $5,264.31 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ T-POLE |
______ CAMERA |
______ CAMERA |
______ MISCFRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ MISCFRAME |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ T-HEAT |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|