|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/30/2006
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B06-0195
|
JOB ADDRESS: 13971 MILLTOWN DRIVE FRISCO, TX |
DESC:
2151 AC, 2575 SF, SFR / 1 STORY |
|
OWNER:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
CONTRACTOR:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
ISSUED DATE: 2/2/2006
APPLIED DATE:1/16/2006
EXPIRED DATE:8/1/2006
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
1445 MACARTHUR DR. #100 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 160486.11
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SEWER IMPACT FEE | $523.00 |
THOROUGHFARE IMPACT FEE | $2,242.00 |
WATER IMPACT FEE | $388.00 |
2NDS/FRAMING 4/12/2006 CSW | $30.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
PLUMBING TOP OU 3/28/2006 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
SET 1 PD METER 2/10/2006 RGH | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
ELECTRICAL FINAL 5/19/2006 W | $30.00 |
CO/BUILDING FINAL 6/7/2006 W | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,298.75 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
RESIDENTIAL ELECTRIC FEE | $77.25 |
PLUMBING FINAL 5/19/2006 | $30.00 |
Total Fees: | $6,013.50 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ GAS RELEASE |
______ WATER REGISTER |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|