|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/3/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-4330
|
JOB ADDRESS: 4492 LINDENWOOD DR FRISCO, TX 75034 |
DESC:
4043 AC, 4710 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 12/7/2005
APPLIED DATE:11/22/2005
EXPIRED DATE:6/13/2006
SITE APN:D267113
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 301648.23
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL RED TAG FEE | $30.00 |
SLAB 3/29/2006 TW | $30.00 |
SLAB 3/27/2006 TW | $30.00 |
SLAB 3/23/2006 TW | $30.00 |
PLUMBING ROUGH- 3/2/2006 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
PLUMBING FINAL 9/8/06 | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
FLATWORK 4/6/2006 JM | $30.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $2,003.75 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
RESIDENTIAL ELECTRIC FEE | $141.30 |
LAWNSPRINKLERSYSTEM | $35.00 |
Total Fees: | $3,189.55 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ FLATWORK |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|