APPROVED DATE: 11/23/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-4211
|
JOB ADDRESS: 10339 BURNT MILL LN FRISCO, TX 75035 |
DESC:
4378 AC, 4929 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 11/30/2005
APPLIED DATE:11/14/2005
EXPIRED DATE:5/27/2006
SITE APN:ADD66888
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 326642.58
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH- 12/5/2005 | $30.00 |
PLUMBING TOP OU 2/13/2006 | $30.00 |
UTILITY / ROW 4/18/2006 GAS | $30.00 |
T-POLE 12/6/2005 GDS | $30.00 |
CO/BUILDING FINAL 4/26/2006 | $30.00 |
PLUMBING FINAL 4/20/2006 | $30.00 |
PLUMBING FINAL 4/24/2006 GU | $30.00 |
CO/BUILDING FINAL 4/28/2006 | $30.00 |
ELECTRICAL FINAL 4/7/2006 JT | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
INSULATION 2/23/2006 MC | $30.00 |
PLUMBING TOP OU 2/15/2006 | $30.00 |
PLUMBING TOP OUT 2/9/2006 TR | $30.00 |
RESIDENTIAL ELECTRIC FEE | $147.87 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $253.00 |
BUILDING PERMIT FEE | $2,128.75 |
FENCE FEE | $20.00 |
FLATWORK 12/16/2005 WKT | $30.00 |
SLAB 12/16/2005 WKT | $30.00 |
Total Fees: | $3,505.62 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|