|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/1/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-4180
|
JOB ADDRESS: 9446 IRONWOOD DRIVE FRISCO, TX 75034 |
DESC:
4102 AC, 4947 SF, SFR / 2 STORY |
|
OWNER:
AVERY EDWARDS CUSTOM HOMES
1100 MIRA VISTA BLVD PLANO TX 75093
|
CONTRACTOR:
AVERY EDWARDS CUSTOM HOMES
1100 MIRA VISTA BLVD PLANO TX 75093
|
ISSUED DATE: 12/5/2005
APPLIED DATE:11/30/2005
EXPIRED DATE:6/4/2006
SITE APN:D266209
STATUS:COMPLETED
|
|
APPLICANT:
AVERY EDWARDS CUSTOM HOMES
1100 MIRA VISTA BLVD PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 306050.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 2/1/2006 CB | $30.00 |
DRY WALL 5/19/2006 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLAN REVIEW FEE | $50.00 |
SLAB 1/27/2006 JTH | $30.00 |
UTILITY / ROW 6/22/2006 KB | $30.00 |
SLAB 1/30/2006 | $30.00 |
PLUMBING TOP OU 3/15/2006 | $30.00 |
PLUMBING TOP OU 3/21/2006 | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
INSULATION 5/4/2006 TW | $30.00 |
DRY WALL 1995/12/32 TW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $148.41 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $2,028.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 4/7/2006 WKT | $30.00 |
Total Fees: | $3,359.16 |
|
|
| ______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|