APPROVED DATE: 1/5/2006
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B05-3838
|
JOB ADDRESS: 7277 FRISCO LAKES DR FRISCO, TX 75034 |
DESC:
32000 SQ FT, CNEW / FRISCO LAKES AMENITY CENTER |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
S4 CONSTRUCTION, LTD
P.O. BOX 1098 FRISCO TX 75034
|
ISSUED DATE: 1/11/2006
APPLIED DATE:11/8/2005
EXPIRED DATE:5/22/2006
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
Carter & Burgess, Inc.
7950 Elmbrook Dr., Suite 250 Dallas TX 752474951
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 10000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER IMPACT FEE | $512.00 |
SEWER IMPACT FEE | $696.00 |
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $490.00 |
WATER METER DEPOSIT | $75.00 |
2 INCH PD METER | $490.00 |
MISCELLANOUS MECHANICAL FEES | $310.70 |
MISCELLANEOUS PLUMBING FEES | $394.00 |
COMMERCIAL ELECTRIC FEE | $1,300.00 |
COMMERCIAL BUILDING PERMIT FEE | $20,377.14 |
ELECTRICAL FINA 12/20/06 | $35.00 |
COMM PLUMB TOP 9/6/06 | $35.00 |
PLUMBING FINAL 12/18/06 | $35.00 |
Total Fees: | $24,824.84 |
|
|
| ______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ ELECTRICAL |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ SEWER |
______ T-POLE |
______ ELECTRICAL RELEASE |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ ELECTRICAL |
______ WATER |
______ FIRELANE INSPECTION |
______ FIRELANE INSPECTION |
______ PAVING |
______ PAVING |
______ PAVING |
______ FIRELANE INSPECTION |
______ PAVING |
______ PAVING |
______ FRAME |
______ METER PAYMENT |
______ SLAB |
______ SET 2 PD METER |
______ BRICK/WALL TIES |
______ LATH |
______ COMM PLUMB TOP OUT |
______ MECHANICAL |
______ BRICK/WALL TIES |
______ COMM PLUMB TOP OUT |
______ PLUMBING ROUGH-IN |
______ COMM PLUMB TOP OUT |
______ ELEC WALL |
______ COMM FRAME |
______ INSULATION |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ COMM PLUMB TOP OUT |
______ INSULATION |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL RELEASE |
______ COMM FRAME |
______ ELECTRICAL ROUGH IN |
______ COMM SLAB |
______ ELECTRICAL ROUGH IN |
______ INSULATION |
______ DRY WALL |
______ COMM SLAB |
______ ELECTRICAL ROUGH IN |
______ CEILING |
______ DUCT ROUGH |
______ PIER |
______ ELEC WALL |
______ INSULATION |
______ ELEC WALL |
______ FOOTINGS |
______ CEILING |
______ FOOTINGS |
______ CEILING |
______ PLUMBING ROUGH-IN |
______ B-STEEL |
______ SLAB |
______ PIER |
______ COURTESY HEALTH INSP |
______ PLUMBING ROUGH-IN |
______ GAS PRESSURE |
______ METER PAYMENT |
______ FOOTINGS |
______ SET 2 PD METER |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ FOOTINGS |
______ HEALTH FINAL |
______ ELECTRICAL ROUGH IN |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ HEALTH FINAL |
______ BUILDING FINAL |
______ BUILDING FINAL |
______ BUILDING FINAL |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ COMM SLAB |
______ SLAB |
______ COMM PLUMB TOP OUT |
______ PLUMBING ROUGH-IN |
______ COMM PLUMB TOP OUT |
______ ELECTRICAL RELEASE |
______ GAS PRESSURE |
______ BUILDING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ BUILDING FINAL |
______ MISCCO |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|