|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/22/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-3810
|
JOB ADDRESS: 13622 VALLEY MILLS DR FRISCO, TX 75034 |
DESC:
1854 AC, 2358 SF, SFR / 1 STORY |
|
OWNER:
BUESCHER HOMES
1445 MC ARTHUR DRIVE #100 CARROLLTON TX 75007
|
CONTRACTOR:
BUESCHER HOMES
1445 MC ARTHUR DRIVE #100 CARROLLTON TX 75007
|
ISSUED DATE: 10/26/2005
APPLIED DATE:10/11/2005
EXPIRED DATE:4/25/2006
SITE APN:D268777
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
1445 MC ARTHUR DRIVE #100 CARROLLTON TX 75007
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 138326.94
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 1/10/2006 CSW | $30.00 |
2NDS/FRAMING 1/13/2006 CSW | $30.00 |
2NDS/FRAMING 1995/12/32 CSW | $30.00 |
2NDS/FRAMING 1/17/2006 CSW | $30.00 |
ELECTRICAL FINAL 2/14/2006 C | $30.00 |
UTILITY / ROW 02/15/2006 GAS | $30.00 |
PLUMBING FINAL 2/16/2006 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS/FRAMING 12/29/2005 TW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $70.74 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,188.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,203.99 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ T-POLE |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|