|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/21/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-3775
|
JOB ADDRESS: 5129 IROQUOIS DR FRISCO, TX 75034 |
DESC:
4415 AC, 5286 SF, SFR / 2 STORY |
|
OWNER:
JPCB, INC.
5968 TIPPERARY PLANO TX 75093
|
CONTRACTOR:
|
ISSUED DATE: 10/26/2005
APPLIED DATE:10/10/2005
EXPIRED DATE:4/25/2006
SITE APN:D242732
STATUS:COMPLETED
|
|
APPLICANT:
JPCB, INC.
5968 TIPPERARY PLANO TX 75093
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 329403.15
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 1/9/2006 CB | $30.00 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $2.70 |
2NDS/FRAMING 3/2/2006 CW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $158.58 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $295.00 |
BUILDING PERMIT FEE | $2,143.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OU 2/22/2006 | $30.00 |
PLUMBING ROUGH-IN 1995/12/32 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING FINAL 6/5/2006 | $30.00 |
PLUMBING FINAL 6/6/2006 TRC | $30.00 |
2NDS/FRAMING 3/6/2006 | $30.00 |
INSULATION 3/21/2006 | $30.00 |
2NDS/FRAMING 3/8/2006 TW | $30.00 |
INSULATION 3/15/2006 TW | $30.00 |
INSULATION 3/16/2006 TW | $30.00 |
SLAB 1/3/2006 WKT | $30.00 |
Total Fees: | $3,536.13 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|