|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/15/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-3702
|
JOB ADDRESS: 1457 SUNLAND PARK DR FRISCO, TX 75034 |
DESC:
3274 AC, 4073 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 10/19/2005
APPLIED DATE:10/2/2005
EXPIRED DATE:4/18/2006
SITE APN:D263789
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 244273.14
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH-IN 10/21/2005 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
2NDS/FRAMING 12/21/2005 GDS | $30.00 |
2NDS/FRAMING 12/22/2005 GLQ | $30.00 |
PLUMBING FINAL 2/10/2006 | $30.00 |
PLUMBING FINAL 2/14/2006 | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
PLUMBING TOP OUT 12/9/2005 P | $30.00 |
PLUMBING TOP OUT 12/13/2005 | $30.00 |
SLAB 11/3/2005 TW | $30.00 |
INSULATION 1/3/2006 TW | $30.00 |
INSULATION 1/4/2006 TW | $30.00 |
INSULATION 1/5/2006 TW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $122.85 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,718.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,995.10 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|