|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/28/2005
|
PERMIT SUB-TYPE: CIFO
|
PERMIT NO: B05-3642
|
JOB ADDRESS: 8811 TEEL PKWY #200 FRISCO, TX |
DESC:
2800 SQ FT, CIFO / SALON POUR VOUS |
|
OWNER:
JOHN WAYBERG
8811 TEEL PKWY #200 FRISCO TX
|
CONTRACTOR:
LAKEWOOD ENT. INC.
2331 GUS THOMASSON RD. # 129 DALLAS TX 75228
|
ISSUED DATE: 11/29/2005
APPLIED DATE:11/28/2005
EXPIRED DATE:5/27/2006
SITE APN:
STATUS:COMPLETED
|
|
APPLICANT:
LAKEWOOD ENT. INC.
2331 GUS THOMASSON RD. # 129 DALLAS TX 75228
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 200000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL RELEASE 6/27/2006 | $35.00 |
CEILING 6/27/2006 GDS | $35.00 |
PRE POUR INSP 12/12/2005 JB | $35.00 |
ELECTRICAL 6/22/2006 JB | $35.00 |
MISCELLANOUS MECHANICAL FEES | $129.60 |
MISCELLANEOUS PLUMBING FEES | $116.00 |
COMMERCIAL ELECTRIC FEE | $132.00 |
COMMERCIAL BUILDING PERMIT FEE | $896.25 |
REPLACEMENT CARD FEE | $22.00 |
CREDIT CARD CONVENIENCE FEE | $3.00 |
Total Fees: | $1,438.85 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PRE POUR INSP |
______ SLAB |
______ ELECTRICAL FINAL |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL RELEASE |
______ ELECTRICAL |
______ ELECTRICAL RELEASE |
______ CEILING |
______ CEILING |
______ ELECTRICAL RELEASE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ ELECTRICAL FINAL |
______ MECHANICAL FINAL |
______ COMM CO |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|