|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/1/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-3525
|
JOB ADDRESS: 8625 DAVIS DR FRISCO, TX 75034 |
DESC:
3310 AC, 3865 SF, SFR / 2 STORY |
|
OWNER:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100 DALLAS TX 75248
|
CONTRACTOR:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100 DALLAS TX 75248
|
ISSUED DATE: 10/6/2005
APPLIED DATE:9/15/2005
EXPIRED DATE:4/5/2006
SITE APN:D259759
STATUS:COMPLETED
|
|
APPLICANT:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100 DALLAS TX 75248
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 246959.1
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 5/24/2006 | $30.00 |
CONVENIENCE FEE | $0.90 |
2NDS/FRAMING 3/14/2006 CW | $30.00 |
2NDS/FRAMING 3/27/2006 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING ROUGH-IN 11/30/2005 | $30.00 |
2NDS/FRAMING 3/22/2006 JM | $30.00 |
UTILITY / ROW 5/17/2006 KB | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
PLUMBING ROUGH-IN 11/29/2005 | $30.00 |
SET 1 PD METER 11/11/2005 RG | $30.00 |
SET 1 PD METER 11/22/2005 RG | $30.00 |
PLUMBING FINAL 5/22/2006 TRC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $115.95 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
BUILDING PERMIT FEE | $1,728.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,930.10 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ GAS |
______ GAS RELEASE |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|