|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/15/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-3211
|
JOB ADDRESS: 1605 HILTON HEAD LN FRISCO, TX 75034 |
DESC:
5502 AC, 7160 SF, SFR 2 STORY |
|
OWNER:
PARTHENON HOMES X- 06/05
1680 PRINCE WILLIAM LN. FRISCO TX 75034
|
CONTRACTOR:
PARTHENON HOMES X- 06/05
1680 PRINCE WILLIAM LN. FRISCO TX 75034
|
ISSUED DATE: 9/19/2005
APPLIED DATE:9/9/2005
EXPIRED DATE:3/18/2006
SITE APN:D239933
STATUS:COMPLETED
|
|
APPLICANT:
PARTHENON HOMES X- 06/05
1680 PRINCE WILLIAM LN. FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 410504.22
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $3.60 |
CONVENIENCE FEE | $1.80 |
CONVENIENCE FEE | $0.90 |
FLATWORK 4/6/2006 CSW | $30.00 |
ELECTRICAL FINAL 5/2/2006 CW | $30.00 |
CO/BUILDING FINAL 5/10/2006 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
2NDS/FRAMING 12/20/2005 GLQ | $30.00 |
PLUMBING TOP OU 12/1/2005 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $214.80 |
MISCELLANOUS MECHANICAL FEES | $162.50 |
MISCELLANEOUS PLUMBING FEES | $284.00 |
BUILDING PERMIT FEE | $2,548.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OUT 12/6/2005 K | $30.00 |
PLUMBING TOP OUT 12/12/2005 | $30.00 |
PLUMBING TOP OUT 12/15/2005 | $30.00 |
PLUMBING FINAL 5/2/2006 TRC | $30.00 |
INSULATION 1/26/2006 TW | $30.00 |
INSULATION 1/13/2006 TW | $30.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $3,984.95 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ FLATWORK |
______ FLATWORK |
______ T-HEAT |
______ PLUMBING FINAL |
______ GAS RELEASE |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|