|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/8/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2943
|
JOB ADDRESS: 6345 SWEENEY TRL FRISCO, TX 75034 |
DESC:
5392 AC, 6776 SF, SFR / 2 STORY |
|
OWNER:
CRESSWELL ENTERPRISES INC.
4949 KELLER SPRINGS RD ADDISON TX 75001
|
CONTRACTOR:
CRESSWELL ENTERPRISES INC.
4949 KELLER SPRINGS RD ADDISON TX 75001
|
ISSUED DATE: 9/22/2005
APPLIED DATE:7/27/2005
EXPIRED DATE:6/4/2007
SITE APN:C2557523
STATUS:COMPLETED
|
|
APPLICANT:
CRESSWELL ENTERPRISES INC.
4949 KELLER SPRINGS RD ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 400058.82
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD CONVENIENCE FEE | $2.50 |
WATER METER DEPOSIT | $75.00 |
ELECTRICAL FINA 11/15/06 | $30.00 |
CREDIT CARD FEE | $2.70 |
ILLEGAL JUMPER | $500.00 |
1 INCH METER | $0.00 |
SET 1 PD METER 11/2/2005 RGH | $30.00 |
PLUMBING ROUGH- 10/11/2005 | $30.00 |
PLUMBING FINAL 11/15/06 | $30.00 |
2NDS/FRAMING 3/6/2006 | $30.00 |
2NDS/FRAMING 3/10/2006 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $203.28 |
MISCELLANOUS MECHANICAL FEES | $175.50 |
MISCELLANEOUS PLUMBING FEES | $312.00 |
BUILDING PERMIT FEE | $2,498.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,969.73 |
|
|
| ______ T-POLE |
______ PIER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ METER PAYMENT |
______ SET 1 1/2 PD METER |
______ SET 1 PD METER |
______ SLAB |
______ CAMERA |
______ SET 1 PD METER |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|