|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 8/4/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2812
|
JOB ADDRESS: 15499 BULL RUN DR FRISCO, TX 75035 |
DESC:
2319 AC, 2872 SF, SFR / 2 STORY |
|
OWNER:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
CONTRACTOR:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
ISSUED DATE: 9/30/2005
APPLIED DATE:8/1/2005
EXPIRED DATE:
SITE APN:C2538313
STATUS:COMPLETED
|
|
APPLICANT:
DR HORTON
1901 ASCENSION BLVD.,#100 ARLINGTON TX 76006
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 173020.59
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
T-POLE 10/3/2005 CW | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
UTILITY / ROW 01/23/2006 GAS | $30.00 |
RESIDENTIAL ELECTRIC FEE | $86.16 |
MISCELLANOUS MECHANICAL FEES | $116.50 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,363.75 |
FENCE FEE | $20.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
PLUMBING FINAL 1/6/2006 PDC | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 1/9/2006 | $30.00 |
PLUMBING FINAL 1/18/2006 | $30.00 |
Total Fees: | $2,840.41 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ WATER REGISTER |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|