Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 7/15/2005 PERMIT SUB-TYPE: SNEW PERMIT NO: B05-2607
JOB ADDRESS:
11308 HENDERSON DR
FRISCO, TX 75035
DESC:   2695 AC, 3226 SF, SFR / 2 STORY
OWNER:
LEGACY HOMES
4050 W PARK BLVD
PLANO TX 75093

CONTRACTOR:
LEGACY HOMES
4050 W PARK BLVD
PLANO TX 75093
ISSUED DATE:
7/20/2005
APPLIED DATE:
7/10/2005
EXPIRED DATE:
1/16/2006
SITE APN:
C2519639
STATUS:
COMPLETED
APPLICANT:
LEGACY HOMES
4050 W PARK BLVD
PLANO TX 75093
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
201073.95
FEE SUMMARY
INSPECTION SUMMARY
CAMERA 8/5/2005 CB$30.00
CO/BUILDING FINAL 11/7/2005$30.00
PLUMBING TOP OU 8/30/2005$30.00
PLUMBING TOP OUT 8/29/2005 G$30.00
RESIDENTIAL ELECTRIC FEE$96.78
MISCELLANOUS MECHANICAL FEES$116.50
MISCELLANEOUS PLUMBING FEES$204.00
BUILDING PERMIT FEE$1,503.75
FENCE FEE$20.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
CO/BUILDING FINAL 11/17/2005$30.00
LAWNSPRINKLERSYSTEM$35.00
CREDIT CARD CONVENIENCE FEE$3.90
INSULATION 9/13/2005 TP$30.00
DRY WALL 9/16/2005 TP$30.00
FLATWORK 10/12/2005 TP$30.00
Total Fees:$2,584.93
______  METER PAYMENT
______  SET 1 PD METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  T-POLE
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  INSULATION
______  DRY WALL
______  FLATWORK
______  FLATWORK
______  PLUMBING FINAL
______  FLATWORK
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)