BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/7/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2477
|
JOB ADDRESS: 1731 TORREY PINES LN FRISCO, TX 75034 |
DESC:
3497 AC, 5089 SQ FT, SFR / 2 STORY |
|
OWNER:
JOHN AND TIFFANY BAMBERG
7244 DOGWOOD CREEK LANE DALLAS TX 75252
|
CONTRACTOR:
JOHN AND TIFFANY BAMBERG
|
ISSUED DATE: 7/11/2005
APPLIED DATE:7/1/2005
EXPIRED DATE:1/7/2006
SITE APN:D239927
STATUS:COMPLETED
|
|
APPLICANT:
JOHN AND TIFFANY
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 260911.17
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CAMERA 8/25/2005 CB | $30.00 |
CAMERA 9/8/2005 CB | $30.00 |
CO/BUILDING FINAL 5/25/2006 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING TOP OU 11/14/2005 | $30.00 |
PLUMBING TOP OUT 11/3/2005 G | $30.00 |
2NDS/FRAMING 1/9/2006 TW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $152.67 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
FENCE FEE | $20.00 |
BUILDING PERMIT FEE | $1,798.75 |
Total Fees: | $2,926.42 |
|
|
| ______ T-POLE |
______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ CAMERA |
______ CAMERA |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ MISC FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|