|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 9/30/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2468
|
JOB ADDRESS: 2339 MACKINAC DR , TX 75034 |
DESC:
1926 AC, 2519 SF, SFR 1 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 4/2/2006
APPLIED DATE:9/26/2005
EXPIRED DATE:11/19/2006
SITE APN:D268724
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 143698.86
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BRICK/WALL TIES 1/13/2006 CS | $30.00 |
INSULATION 1/13/2006 CSW | $30.00 |
BRICK/WALL TIES 1/17/2006 CS | $30.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
UTILITY / ROW 03/31/2006 GAS | $30.00 |
PLUMBING FINAL 2/21/2006 | $30.00 |
PLUMBING FINAL 2/24/2006 | $30.00 |
PLUMBING FINAL 3/1/2006 | $30.00 |
PLUMBING FINAL 3/2/2006 | $30.00 |
INSULATION 1/13/2006 JTH | $30.00 |
PLUMBING FINAL 2/22/2006 | $30.00 |
CO/BUILDING FINAL 4/10/2006 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING TOP OU 12/7/2005 | $30.00 |
PLUMBING TOP OU 12/28/2005 | $30.00 |
PLUMBING TOP OUT 11/21/2005 | $30.00 |
PLUMBING TOP OUT 12/9/2005 T | $30.00 |
PLUMBING TOP OUT 12/13/2005 | $30.00 |
PLUMBING TOP OUT 12/27/2005 | $30.00 |
2NDS/FRAMING 1/3/2006 TW | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $75.57 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,213.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,133.82 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ WATER REGISTER |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|