|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/8/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2203
|
JOB ADDRESS: 4367 REPUBLIC DR FRISCO, TX 75034 |
DESC:
3049 AC, 3612 SF, SFR / 2 STORY |
|
OWNER:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
CONTRACTOR:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
ISSUED DATE: 7/13/2005
APPLIED DATE:6/10/2005
EXPIRED DATE:
SITE APN:D237177
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 227485.89
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING ROUGH- 7/18/2005 | $30.00 |
PLUMBING ROUGH- 7/19/2005 | $30.00 |
PLUMBING TOP OU 8/31/2005 | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
UTILITY / ROW 10/26/2005 GAS | $30.00 |
SLAB 7/29/2005 GLC | $30.00 |
2NDS/FRAMING 9/2/2005 GLC | $30.00 |
PLUMBING FINAL 10/18/2005 PD | $30.00 |
PLUMBING FINAL 10/20/2005 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
RESIDENTIAL ELECTRIC FEE | $108.36 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $1,633.75 |
FENCE FEE | $20.00 |
CO/BUILDING FINAL 11/11/2005 | $30.00 |
Total Fees: | $2,814.11 |
|
|
| ______ METER PAYMENT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ SET 5/8 PD METER |
______ SLAB |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|