APPROVED DATE: 6/21/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2190
|
JOB ADDRESS: 2332 ASPERMOUNT DR FRISCO, TX 75034 |
DESC:
2037 AC, 2525 SF, SFR / 1 STORY |
|
OWNER:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
CONTRACTOR:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
ISSUED DATE: 6/27/2005
APPLIED DATE:6/9/2005
EXPIRED DATE:12/26/2005
SITE APN:D255508
STATUS:COMPLETED
|
|
APPLICANT:
PULTE HOMES
1234 LAKESHORE DR, #750A COPPELL TX 75019
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 151980.57
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
CAMERA 8/9/2005 CB | $30.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
T-POLE 7/25/2005 | $30.00 |
T-POLE 7/27/2005 | $30.00 |
SLAB 8/5/2005 | $30.00 |
PLUMBING TOP OU 8/31/2005 | $30.00 |
CO/BUILDING FINAL 11/8/2005 | $30.00 |
PLUMBING FINAL 10/31/2005 | $30.00 |
2NDS/FRAMING 9/6/2005 TW | $30.00 |
INSULATION 9/19/2005 TW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $75.75 |
MISCELLANOUS MECHANICAL FEES | $96.50 |
MISCELLANEOUS PLUMBING FEES | $188.00 |
BUILDING PERMIT FEE | $1,253.75 |
FENCE FEE | $20.00 |
Total Fees: | $2,304.00 |
|
|
| ______ METER PAYMENT |
______ SET 1 PD METER |
______ T-POLE |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|