|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 7/6/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-2104
|
JOB ADDRESS: 5804 BROOKHILL LN FRISCO, TX 75034 |
DESC:
2804 AC, 3235 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 7/8/2005
APPLIED DATE:6/21/2005
EXPIRED DATE:1/4/2006
SITE APN:D255379
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 207863.46
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2NDS/FRAMING 8/31/2005 CSW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $97.05 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,533.75 |
FENCE FEE | $20.00 |
WATER METER DEPOSIT | $75.00 |
1 INCH METER | $290.00 |
PLUMBING FINAL 10/7/2005 PDC | $30.00 |
Total Fees: | $2,416.30 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK/WALL TIES |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|