|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 5/26/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1856
|
JOB ADDRESS: 4603 FALLMEADOW DR , TX 75034 |
DESC:
4893 AC, 5729 SF, SFR / 2 STORY |
|
OWNER:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
CONTRACTOR:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
ISSUED DATE: 6/21/2005
APPLIED DATE:6/7/2005
EXPIRED DATE:12/20/2005
SITE APN:D267136
STATUS:COMPLETED
|
|
APPLICANT:
GRAND HOMES
8350 N CENTRAL EXPRSWY, SUITE DALLAS TX 75206
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 365066.73
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 8/24/2005 C | $30.00 |
2NDS/FRAMING 1995/12/32 CSW | $30.00 |
CO/BUILDING FIN 1/25/2006 | $30.00 |
CO/BUILDING FINAL 1/26/2006 | $30.00 |
SLAB 7/11/2005 GLC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $171.87 |
MISCELLANOUS MECHANICAL FEES | $149.50 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $2,323.75 |
FENCE FEE | $20.00 |
PLUMBING FINAL 1/13/2006 | $30.00 |
PLUMBING FINAL 1/18/2006 | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
INSULATION 11/9/2005 MC | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH-IN 6/29/2005 | $30.00 |
PLUMBING TOP OUT 10/21/2005 | $30.00 |
PLUMBING TOP OUT 10/25/2005 | $30.00 |
1 INCH METER | $290.00 |
WATER METER DEPOSIT | $75.00 |
SET 1 PD METER 6/28/2005 RGH | $0.00 |
PLUMBING TOP OU 9/23/2005 | $30.00 |
PLUMBING TOP OU 10/26/2005 | $30.00 |
INSULATION 11/11/2005 WKT | $30.00 |
Total Fees: | $3,727.12 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ FLATWORK |
______ INSULATION |
______ FLATWORK |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ BRICK |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ 2NDS/FRAMING |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|