Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 5/18/2005 PERMIT SUB-TYPE: SNEW PERMIT NO: B05-1839
JOB ADDRESS:
10366 BANCROFT LN
FRISCO, TX 75035
DESC:   3168 AC, 3605 SF, SFR / 2 STORY
OWNER:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100
DALLAS TX 75248

CONTRACTOR:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100
DALLAS TX 75248
ISSUED DATE:
6/14/2005
APPLIED DATE:
5/10/2005
EXPIRED DATE:
12/13/2005
SITE APN:
C2537704
STATUS:
COMPLETED
APPLICANT:
NEWMARK HOME CORP.
17103 PRESTON RD, SUITE 100
DALLAS TX 75248
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
236364.48
FEE SUMMARY
INSPECTION SUMMARY
CREDIT CARD CONVENIENCE FEE$1.20
CONVENIENCE FEE$0.90
CONVENIENCE FEE$0.90
2NDS/FRAMING 9/13/2005 CSW$30.00
UTILITY / ROW 11/08/2005 GAS$30.00
UTILITY / ROW 11/09/2005 GAS$30.00
CO/BUILDING FINAL 11/11/2005$30.00
PLUMBING TOP OU 8/31/2005$30.00
RESIDENTIAL ELECTRIC FEE$108.15
MISCELLANOUS MECHANICAL FEES$123.00
MISCELLANEOUS PLUMBING FEES$204.00
BUILDING PERMIT FEE$1,678.75
FENCE FEE$20.00
WATER METER DEPOSIT$75.00
1 INCH METER$290.00
CO/BUILDING FINAL 11/17/2005$30.00
ELECTRICAL FINAL 10/31/2005$30.00
CREDIT CARD CONVENIENCE FEE$1.80
2NDS/FRAMING 9/7/2005 TP$30.00
2NDS/FRAMING 9/12/2005 TP$30.00
2NDS/FRAMING 9/14/2005 TP$30.00
ELECTRICAL FINAL 10/28/2005$30.00
LAWNSPRINKLERSYSTEM$35.00
Total Fees:$2,868.70
______  METER PAYMENT
______  SET 1 PD METER
______  T-POLE
______  PLUMBING ROUGH-IN
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK/WALL TIES
______  DRY WALL
______  FLATWORK
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  UTILITY / ROW
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)