BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/25/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1397
|
JOB ADDRESS: 11346 SNYDER DR FRISCO, TX 75035 |
DESC:
2465 A/C, 2883 SF, SFR / 2 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 4/27/2005
APPLIED DATE:4/14/2005
EXPIRED DATE:10/24/2005
SITE APN:C2519861
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 183913.65
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
ELECTRICAL FINAL 7/11/2005 C | $30.00 |
1 INCH METER | $365.00 |
PLUMBING TOP OUT 7/13/2005 G | $30.00 |
PLUMBING FINAL 7/25/2005 GU | $30.00 |
CO/BUILDING FINAL 8/5/2005 P | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING ROUGH- 5/5/2005 | $30.00 |
PLUMBING TOP OUT 5/27/2005 T | $30.00 |
RESIDENTIAL ELECTRIC FEE | $86.49 |
MISCELLANOUS MECHANICAL FEES | $129.00 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,413.75 |
FENCE FEE | $20.00 |
FLATWORK 5/10/2005 WKT | $30.00 |
FLATWORK 5/11/2005 WKT | $30.00 |
2NDS/FRAMING 6/2/2005 WKT | $30.00 |
2NDS/FRAMING 6/7/2005 WKT | $30.00 |
INSULATION 6/15/2005 WKT | $30.00 |
INSULATION 6/17/2005 WKT | $30.00 |
Total Fees: | $2,613.24 |
|
|
| ______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ FLATWORK |
______ SLAB |
______ METER PAYMENT |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ BRICK |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING TOP OUT |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING TOP OUT |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|