|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/25/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1374
|
JOB ADDRESS: 12006 KINGSVILLE DR FRISCO, TX 75035 |
DESC:
4289 A/C, 4729 SF, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 4/27/2005
APPLIED DATE:4/12/2005
EXPIRED DATE:10/24/2005
SITE APN:C2554347
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 320002.29
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
RESIDENTIAL ELECTRIC FEE | $141.87 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $2,098.75 |
FENCE FEE | $20.00 |
2NDS/FRAMING 11/16/2005 JM | $30.00 |
1 INCH METER | $365.00 |
INSULATION 11/30/2005 PDC | $30.00 |
2NDS/FRAMING 11/3/2005 RM | $30.00 |
2NDS/FRAMING 11/4/2005 RM | $30.00 |
2NDS/FRAMING 11/8/2005 RM | $30.00 |
2NDS/FRAMING 11/10/2005 RM | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS/FRAMING 10/26/2005 TP | $30.00 |
PLUMBING FINAL 1/25/2006 | $30.00 |
PLUMBING FINAL 1/26/2006 TRC | $30.00 |
Total Fees: | $3,322.62 |
|
|
| ______ T-POLE |
______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK/WALL TIES |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|