BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 4/25/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1365
|
JOB ADDRESS: 12076 STEPHENVILLE DR FRISCO, TX 75035 |
DESC:
4289 A/C, 4729 SF, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 4/27/2005
APPLIED DATE:4/12/2005
EXPIRED DATE:10/26/2005
SITE APN:ADD37480
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 320002.29
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 12/6/2005 | $30.00 |
SLAB 7/26/2005 CW | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
T-POLE 11/11/2005 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $141.87 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $246.00 |
BUILDING PERMIT FEE | $2,098.75 |
FENCE FEE | $20.00 |
CO/BUILDING FINAL 1/24/2006 | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
1 INCH METER | $365.00 |
ELECTRICAL FINAL 12/6/2005 R | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
2NDS/FRAMING 10/11/2005 TP | $30.00 |
2NDS/FRAMING 10/13/2005 TP | $30.00 |
2NDS/FRAMING 10/14/2005 TP | $30.00 |
BRICK/WALL TIES 10/27/2005 T | $30.00 |
INSULATION 10/27/2005 TP | $30.00 |
Total Fees: | $3,382.62 |
|
|
| ______ T-POLE |
______ T-POLE |
______ METER PAYMENT |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK/WALL TIES |
______ INSULATION |
______ DRY WALL |
______ T-POLE |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|