APPROVED DATE: 4/14/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1246
|
JOB ADDRESS: 8346 ALBRITTON DR FRISCO, TX 75036 |
DESC:
3948 A/C, 4747 SF, SFR / 2 STORY |
|
OWNER:
DARLING HOMES
2500 LEGACY #100 FRISCO TX 75034
|
CONTRACTOR:
DARLING HOMES
2500 LEGACY #100 FRISCO TX 75034
|
ISSUED DATE: 4/18/2005
APPLIED DATE:4/7/2005
EXPIRED DATE:10/15/2005
SITE APN:ADD57267
STATUS:COMPLETED
|
|
APPLICANT:
DARLING HOMES
2500 LEGACY #100 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 294560.28
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING FINAL 7/22/2005 | $30.00 |
PLUMBING FINAL 7/26/2005 | $30.00 |
1 INCH METER | $365.00 |
2NDS/FRAMING 6/2/2005 | $30.00 |
BRICK 6/8/2005 | $30.00 |
BRICK 6/10/2005 | $30.00 |
DRY WALL 6/10/2005 | $30.00 |
DRY WALL 6/13/2005 | $30.00 |
2NDS/FRAMING 1995/12/32 GLQ | $30.00 |
INSULATION 1995/12/32 GLQ | $30.00 |
BRICK GLQ | $30.00 |
PLUMBING TOP OUT 5/26/2005 T | $30.00 |
RESIDENTIAL ELECTRIC FEE | $142.41 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $260.00 |
BUILDING PERMIT FEE | $1,968.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,222.16 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ CAMERA |
______ WATER METER |
______ METER PAYMENT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ BRICK |
______ DRY WALL |
______ BRICK |
______ BRICK |
______ DRY WALL |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|