APPROVED DATE: 4/11/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-1209
|
JOB ADDRESS: 1292 SUNLAND PARK DR FRISCO, TX 75034 |
DESC:
4216 A/C, 5054 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 4/19/2005
APPLIED DATE:4/3/2005
EXPIRED DATE:4/1/2006
SITE APN:D263750
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 314555.76
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
WATER USAGE ON NON FUNCTIONAL | $500.00 |
UTILITY / ROW 09/12/2005 GAS | $30.00 |
2NDS/FRAMING 1995/12/32 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $151.62 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $2,068.75 |
FENCE FEE | $20.00 |
PLUMBING ROUGH-IN 5/27/2005 | $30.00 |
1 INCH METER | $365.00 |
1 CURBSTOP REPAIR / REPLACE | $150.00 |
SET 1 PD METER RGH | $30.00 |
ELECTRICAL FINAL 9/2/2005 RM | $30.00 |
Total Fees: | $3,760.37 |
|
|
| ______ METER PAYMENT |
______ T-POLE |
______ SET 1 PD METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ SET 1 PD METER |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|