|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/17/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-0481
|
JOB ADDRESS: 11707 FRONTIER DR FRISCO, TX 75034 |
DESC:
4511 A/C, 5404 SF, SFR / 2 STORY |
|
OWNER:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
CONTRACTOR:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
ISSUED DATE: 4/5/2005
APPLIED DATE:2/8/2005
EXPIRED DATE:9/29/2005
SITE APN:D263734
STATUS:COMPLETED
|
|
APPLICANT:
HIGHLAND HOMES
12850 HILLCREST #200 DALLAS TX 75230
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 336565.71
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
BRICK 7/18/2005 CSW | $30.00 |
RESIDENTIAL ELECTRIC FEE | $162.12 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,178.75 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
PLUMBING TOP OUT 6/22/2005 G | $30.00 |
PLUMBING TOP OUT 6/23/2005 G | $30.00 |
PLUMBING ROUGH- 4/11/2005 | $30.00 |
PLUMBING FINAL 8/8/2005 | $30.00 |
PLUMBING TOP OUT 6/14/2005 P | $30.00 |
ELECTRICAL FINAL 8/4/2005 RM | $30.00 |
CO/BUILDING FINAL 8/26/2005 | $30.00 |
PLUMBING TOP OUT 6/24/2005 T | $30.00 |
2NDS/FRAMING 6/28/2005 TP | $30.00 |
INSULATION 7/1/2005 TP | $30.00 |
WATER METER 4/6/2005 RGH | $30.00 |
SLAB 4/27/2005 WKT | $30.00 |
FLATWORK 4/27/2005 WKT | $30.00 |
Total Fees: | $3,562.37 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ METER PAYMENT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK/WALL TIES |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|