|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/16/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-0455
|
JOB ADDRESS: 2329 LANGDON DR , TX 75034 |
DESC:
4083 AC, 4945 SQ FT, SNEW / 2 STORY |
|
OWNER:
MANCHESTER CUSTOM HOMES X-2/05
P.O. BOX 262094 PLANO TX 75026
|
CONTRACTOR:
MANCHESTER CUSTOM HOMES X-2/05
P.O. BOX 262094 PLANO TX 75026
|
ISSUED DATE: 2/18/2005
APPLIED DATE:2/6/2005
EXPIRED DATE:8/17/2005
SITE APN:D272523
STATUS:COMPLETED
|
|
APPLICANT:
MANCHESTER CUSTOM HOMES X-2/05
P.O. BOX 262094 PLANO TX 75026
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 304632.63
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
LAWNSPRINKLERSYSTEM | $35.00 |
RESIDENTIAL ELECTRIC FEE | $148.35 |
MISCELLANOUS MECHANICAL FEES | $142.50 |
MISCELLANEOUS PLUMBING FEES | $274.00 |
BUILDING PERMIT FEE | $2,018.75 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
ELECTRICAL FINAL 1/27/2006 J | $30.00 |
UTILITY / ROW 6/8/2006 KB | $30.00 |
PLUMBING ROUGH-IN 5/17/2005 | $30.00 |
PLUMBING TOP OUT 5/20/2005 P | $30.00 |
2NDS/FRAMING 6/3/2005 TP | $30.00 |
RESIDENTIAL RED TAG FEE | $30.00 |
Total Fees: | $3,183.60 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ METER PAYMENT |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ BRICK |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ 2NDS |
______ PLUMBING TOP OUT |
______ 2NDS |
______ PLUMBING TOP OUT |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ PLUMBING FINAL |
______ SLAB |
______ PLUMBING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|