|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 2/16/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-0428
|
JOB ADDRESS: 4003 MONUMENT LN FRISCO, TX 75034 |
DESC:
3587 A/C, 4328 SF, SFR / 2 STORY |
|
OWNER:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
CONTRACTOR:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
ISSUED DATE: 2/23/2005
APPLIED DATE:2/3/2005
EXPIRED DATE:8/22/2005
SITE APN:D255102
STATUS:COMPLETED
|
|
APPLICANT:
ASHTON WOOD HOMES
13800 MONTFORT SUITE 100 DALLAS TX 76226
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 267626.07
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
DRY WALL 5/6/2005 CSW | $30.00 |
ELECTRICAL FINAL 6/2/2005 CS | $30.00 |
CO/BUILDING FINAL 7/1/2005 C | $30.00 |
2NDS/FRAMING 4/20/2005 GDS | $30.00 |
CO/BUILDING FINAL 7/11/2005 | $30.00 |
2NDS/FRAMING 1995/12/32 GLQ | $30.00 |
RESIDENTIAL ELECTRIC FEE | $129.84 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,833.75 |
FENCE FEE | $20.00 |
PLUMBING FINAL 6/16/2005 | $30.00 |
PLUMBING FINAL 1995/12/32 KS | $30.00 |
PLUMBING FINAL 1995/12/32 KS | $30.00 |
PLUMBING FINAL 1995/12/32 KS | $30.00 |
1 INCH METER | $365.00 |
WATER METER 2/24/2005 RGH | $30.00 |
WATER METER 3/9/2005 RGH | $30.00 |
PLUMBING FINAL 6/9/2005 | $30.00 |
PLUMBING FINAL 6/6/2005 TRC | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
2NDS/FRAMING 4/15/2005 TW | $30.00 |
2NDS/FRAMING 4/18/2005 TW | $30.00 |
2NDS/FRAMING 4/21/2005 TW | $30.00 |
2NDS/FRAMING 4/22/2005 TW | $30.00 |
Total Fees: | $3,278.59 |
|
|
| ______ WATER METER |
______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ WATER METER |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ DRY WALL |
______ INSULATION |
______ DRY WALL |
______ METER PAYMENT |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|