APPROVED DATE: 1/25/2005 PERMIT SUB-TYPE: SNEW PERMIT NO: B05-0322
JOB ADDRESS:
3703 CAPITOL LN
FRISCO, TX 75034
DESC:   3100 AC, 3607 SQ FT, SFR / 2 STORY
OWNER:
LENNAR HOMES
1707 MARKET PLACE BLVD.
IRVING TX 75062

CONTRACTOR:
LENNAR HOMES
1707 MARKET PLACE BLVD.
IRVING TX 75062
ISSUED DATE:
2/14/2005
APPLIED DATE:
1/25/2005
EXPIRED DATE:
8/13/2005
SITE APN:
D255086
STATUS:
COMPLETED
APPLICANT:
LENNAR HOMES
1707 MARKET PLACE BLVD.
IRVING TX 75062
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
231291
FEE SUMMARY
INSPECTION SUMMARY
PLUMBING ROUGH- 3/4/2005$30.00
BUILDING PERMIT FEE$1,653.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$239.00
MISCELLANOUS MECHANICAL FEES$129.50
RESIDENTIAL ELECTRIC FEE$108.21
2NDS/FRAMING 5/12/2005 CSW$30.00
INSULATION 5/19/2005 CSW$30.00
ELECTRICAL FINAL 6/28/2005 C$30.00
LAWNSPRINKLERSYSTEM$35.00
PLUMBING ROUGH- 3/3/2005$30.00
PLUMBING TOP OUT 4/28/2005 G$30.00
PLUMBING FINAL 6/30/2005 PDC$30.00
PLUMBING FINAL 7/11/2005 PDC$30.00
1 INCH METER$365.00
WATER METER 2/23/2005 RGH$30.00
SLAB 3/11/2005 TW$30.00
PLUMBING FINAL 6/28/2005 TW$30.00
PLUMBING FINAL 7/8/2005 TW$30.00
Total Fees:$2,910.46
______  WATER METER
______  WATER METER
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  SLAB
______  SLAB
______  SLAB
______  CAMERA
______  PLUMBING TOP OUT
______  PLUMBING TOP OUT
______  METER PAYMENT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  BRICK
______  INSULATION
______  DRY WALL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  PLUMBING FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)