BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 1/18/2005
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B05-0062
|
JOB ADDRESS: 2266 JAGUAR DR , TX 75034 |
DESC:
3447 AC, 3888 SQ FT, SFR / 2 STORY |
|
OWNER:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
CONTRACTOR:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
ISSUED DATE: 1/21/2005
APPLIED DATE:1/8/2005
EXPIRED DATE:7/20/2005
SITE APN:D249630
STATUS:COMPLETED
|
|
APPLICANT:
MERCEDES HOMES
11494 LUNA ROAD, SUITE #210 FARMERS BRANCH TX 75234
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 257180.67
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OU 2/21/2005 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $116.64 |
MISCELLANOUS MECHANICAL FEES | $116.50 |
MISCELLANEOUS PLUMBING FEES | $204.00 |
BUILDING PERMIT FEE | $1,783.75 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
INSULATION 2/25/2005 PDC | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
PLUMBING FINAL 3/18/2005 | $30.00 |
CREDIT CARD CONVENIENCE FEE | $4.60 |
Total Fees: | $2,735.49 |
|
|
| ______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ METER PAYMENT |
______ T-POLE |
______ CO/BUILDING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ ELECTRICAL FINAL |
______ INSULATION |
______ 2NDS/FRAMING |
______ BRICK |
______ DRY WALL |
______ T-POLE |
______ DRY WALL |
______ PLUMBING ROUGH-IN |
______ FLATWORK |
______ FLATWORK |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ SLAB |
______ CAMERA |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|