Seal BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
APPROVED DATE: 12/18/2004 PERMIT SUB-TYPE: SNEW PERMIT NO: B04-4273
JOB ADDRESS:
3402 NATION DR
FRISCO, TX 75034
DESC:   3703 AC, 4330 SQ FT, SFR / 2 STORY
OWNER:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210
IRVING TX

CONTRACTOR:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210
IRVING TX
ISSUED DATE:
1/10/2005
APPLIED DATE:
12/9/2004
EXPIRED DATE:
7/9/2005
SITE APN:
D254959
STATUS:
COMPLETED
APPLICANT:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210
IRVING TX
LEGAL DESC:
COUNTY:
ZONING:
VALUATION:
276280.83
FEE SUMMARY
INSPECTION SUMMARY
SLAB 1995/12/32 GLQ$30.00
FLATWORK 1995/12/32 GLQ$30.00
1 INCH METER$365.00
2NDS/FRAMING 4/27/2005$30.00
CREDIT CARD CONVENIENCE FEE$2.50
PLUMBING ROUGH-IN 2/18/2005$30.00
BUILDING PERMIT FEE$1,878.75
FENCE FEE$20.00
MISCELLANEOUS PLUMBING FEES$218.00
MISCELLANOUS MECHANICAL FEES$129.50
RESIDENTIAL ELECTRIC FEE$129.90
CREDIT CARD CONVENIENCE FEE$3.90
PLUMBING ROUGH- 2/22/2005$30.00
SLAB 3/4/2005 TW$30.00
FLATWORK 3/4/2005 TW$30.00
Total Fees:$2,957.55
______  WATER METER
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  T-POLE
______  PLUMBING ROUGH-IN
______  PLUMBING ROUGH-IN
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  SLAB
______  FLATWORK
______  CAMERA
______  PLUMBING TOP OUT
______  2NDS/FRAMING
______  2NDS/FRAMING
______  INSULATION
______  METER PAYMENT
______  BRICK
______  DRY WALL
______  PLUMBING FINAL
______  ELECTRICAL FINAL
______  UTILITY / ROW
______  CO/BUILDING FINAL
______  CO/BUILDING FINAL
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)

(THIS IS A BASIC PERMIT VIEW ONLY)