APPROVED DATE: 12/16/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-4118
|
JOB ADDRESS: 6149 CHOCTAW PL FRISCO, TX 75034 |
DESC:
2614 A/C, 3574 SF, SFR / 1 STORY |
|
OWNER:
BRANDON SHYLE
6830DAVIDON STREET #316 THE COLONY TX
|
CONTRACTOR:
G. MICHAEL, LLC X-03/03
8427 ELANE WAY PILOT POINT TX 76258
|
ISSUED DATE: 12/27/2004
APPLIED DATE:11/30/2004
EXPIRED DATE:6/26/2005
SITE APN:D249666
STATUS:COMPLETED
|
|
APPLICANT:
G. MICHAEL, LLC X-03/03
8427 ELANE WAY PILOT POINT TX 76258
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 166604.13
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
CREDIT CARD CONVENIENCE FEE | $3.20 |
PLUMBING ROUGH- 1/7/2005 | $30.00 |
ELECTRICAL RELEASE 5/23/2005 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $78.42 |
MISCELLANOUS MECHANICAL FEES | $109.50 |
MISCELLANEOUS PLUMBING FEES | $225.00 |
BUILDING PERMIT FEE | $1,328.75 |
FENCE FEE | $20.00 |
1 INCH METER | $365.00 |
2NDS/FRAMING 3/11/2005 | $30.00 |
BRICK 4/27/2005 | $30.00 |
PLAN REVIEW FEE | $50.00 |
PLUMBING FINAL 5/16/2005 | $30.00 |
PLUMBING FINAL 1995/12/32 KS | $30.00 |
REPLACEMENT CARD FEE | $10.00 |
ELECTRICAL FINAL 5/16/2005 T | $30.00 |
FLATWORK 5/16/2005 TW | $30.00 |
ELECTRICAL FINAL 5/17/2005 T | $30.00 |
ELECTRICAL FINAL 5/20/2005 T | $30.00 |
CO/BUILDING FINAL 6/6/2005 W | $30.00 |
Total Fees: | $2,519.87 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ T-POLE |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ BRICK |
______ BRICK |
______ CAMERA |
______ METER PAYMENT |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|