BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 12/9/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-4065
|
JOB ADDRESS: 1749 HILTON HEAD LN FRISCO, TX 75034 |
DESC:
4566 AC, 5506 SF, SFR / 2 STORY |
|
OWNER:
BRENTWOOD BUILDERS X-10/03
PO BOX 1829 ADDISON TX 75001
|
CONTRACTOR:
BRENTWOOD BUILDERS X-10/03
PO BOX 1829 ADDISON TX 75001
|
ISSUED DATE: 12/15/2004
APPLIED DATE:11/16/2004
EXPIRED DATE:5/14/2005
SITE APN:D239939
STATUS:COMPLETED
|
|
APPLICANT:
BRENTWOOD BUILDERS X-10/03
PO BOX 1829 ADDISON TX 75001
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 340669.26
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
PLUMBING TOP OUT 3/24/2005 C | $30.00 |
CONVENIENCE FEE | $1.80 |
ELECTRICAL ROUG 4/5/2005 | $30.00 |
2NDS/FRAMING 4/7/2005 | $30.00 |
INSULATION 4/11/2005 | $30.00 |
2NDS/FRAMING 4/11/2005 | $30.00 |
DRY WALL 4/20/2005 | $30.00 |
DRY WALL 4/21/2005 | $30.00 |
ELECTRICAL ROUGH IN 3/29/2005 | $30.00 |
PLUMBING TOP OU 3/25/2005 | $30.00 |
PLUMBING TOP OU 3/29/2005 | $30.00 |
PLUMBING FINAL 9/26/2005 GU | $30.00 |
1 INCH METER | $365.00 |
PLUMBING FINAL 10/4/2005 PDC | $30.00 |
PLUMBING FINAL 10/7/2005 PDC | $30.00 |
FLATWORK 7/12/2005 TP | $30.00 |
PLUMBING FINAL 9/19/2005 | $30.00 |
PLUMBING FINAL 9/27/2005 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $165.18 |
MISCELLANOUS MECHANICAL FEES | $169.00 |
MISCELLANEOUS PLUMBING FEES | $281.00 |
BUILDING PERMIT FEE | $2,198.75 |
FENCE FEE | $20.00 |
Total Fees: | $3,680.73 |
|
|
| ______ WATER METER |
______ PLUMBING ROUGH-IN |
______ T-POLE |
______ SLAB |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PRELIMINARY BUILDING |
______ ELECTRICAL ROUGH IN |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ ELECTRICAL ROUGH IN |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ 2NDS/FRAMING |
______ INSULATION |
______ DRY WALL |
______ DRY WALL |
______ DRY WALL |
______ BRICK |
______ LATH |
______ METER PAYMENT |
______ FLATWORK |
______ APPROACH |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|