|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/13/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-3897
|
JOB ADDRESS: 12435 SHEPHERDS HILL LN FRISCO, TX 75035 |
DESC:
1871 AC, 2341 SQ FT, SFR / 1 STORY |
|
OWNER:
KB HOME
2711 LBJ FRWY. DALLAS TX
|
CONTRACTOR:
KB HOME
2711 LBJ FRWY. DALLAS TX
|
ISSUED DATE: 11/17/2004
APPLIED DATE:11/1/2004
EXPIRED DATE:5/16/2005
SITE APN:C2514749
STATUS:COMPLETED
|
|
APPLICANT:
KB HOME
2711 LBJ FRWY. DALLAS TX
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 139595.31
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
RESIDENTIAL ELECTRIC FEE | $70.23 |
MISCELLANOUS MECHANICAL FEES | $90.00 |
MISCELLANEOUS PLUMBING FEES | $174.00 |
BUILDING PERMIT FEE | $1,193.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 3/17/2005 GAS | $30.00 |
ELECTRICAL FINA 3/9/2005 | $30.00 |
PLUMBING FINAL 3/11/2005 | $30.00 |
PLUMBING FINAL 3/14/2005 | $30.00 |
PLUMBING FINAL 3/15/2005 | $30.00 |
PLUMBING FINAL 3/16/2005 | $30.00 |
PLUMBING FINAL 3/17/2005 | $30.00 |
PLUMBING FINAL 3/18/2005 | $30.00 |
WATER USAGE ON NON FUNCTIONAL | $500.00 |
PLUMBING ROUGH-IN 12/17/2004 | $30.00 |
2NDS/FRAMING 1/27/2005 TW | $30.00 |
T-POLE 1995/12/32 KSH | $30.00 |
Total Fees: | $2,742.98 |
|
|
| ______ T-POLE |
______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ FLATWORK |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ CAMERA |
______ INSULATION |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ BRICK |
______ WATER METER REPLACE |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ WATER METER REPLACE |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|