|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/24/2004
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B04-3734
|
JOB ADDRESS: 3211 INTERNET BLVD FRISCO, TX 75034 |
DESC:
90000 SQ FT, CNEW / HALL OFFICE PARK BLDG #G5 |
|
OWNER:
Hall Financial Group
2595 Dallas Parkway, Suite 300 Frisco TX 75034
|
CONTRACTOR:
AUSTIN COMMERCIAL
3535 TRAVIS ST DALLAS TX 75204
|
ISSUED DATE: 11/30/2004
APPLIED DATE:10/26/2004
EXPIRED DATE:
SITE APN:C2588534
STATUS:COMPLETED
|
|
APPLICANT:
AUSTIN COMMERCIAL
3535 TRAVIS ST DALLAS TX 75204
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 6000000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2 INCH TURB METER | $615.00 |
WATER METER DEPOSIT | $75.00 |
WATER METER DEPOSIT | $75.00 |
3 INCH COMP METER | $1,800.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
MISCELLANEOUS ELECTRICAL FEES | $3,913.20 |
MISCELLANOUS MECHANICAL FEES | $602.50 |
MISCELLANEOUS PLUMBING FEES | $721.00 |
COMMERCIAL BUILDING PERMIT FEE | $12,817.14 |
Total Fees: | $20,653.84 |
|
|
| ______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ SLAB |
______ PAVING |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ PAVING |
______ METER PAYMENT |
______ ELECTRICAL |
______ T-POLE |
______ T-POLE |
______ PAVING |
______ 3 PD METER |
______ SET 2 TURB METER |
______ PAVING |
______ MECHANICAL |
______ ELECTRICAL |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ FRAME |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PAVING |
______ ELECTRICAL |
______ PAVING |
______ ELECTRICAL |
______ ELECTRICAL |
______ PAVING |
______ PLUMBING TOP OUT |
______ ELECTRICAL RELEASE |
______ PAVING |
______ PAVING |
______ CEILING |
______ SET 2 TURB METER |
______ CEILING |
______ CEILING |
______ CEILING |
______ CEILING |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ DOUBLE CHECK |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|