|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 11/9/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-3611
|
JOB ADDRESS: 3449 NATION DR FRISCO, TX 75034 |
DESC:
2905 AC, 3437 SQ FT, SFR / 2 STORY |
|
OWNER:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
CONTRACTOR:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
ISSUED DATE: 12/14/2004
APPLIED DATE:10/3/2004
EXPIRED DATE:5/13/2005
SITE APN:D254969
STATUS:COMPLETED
|
|
APPLICANT:
VILLAGE BUILDERS
1704 MARKET PLACE SUITE 210 IRVING TX
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 216742.05
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
SLAB 1/25/2005 | $30.00 |
ELECTRICAL FINAL 5/9/2005 CS | $30.00 |
ELECTRICAL FINAL 5/10/2005 C | $30.00 |
CO/BUILDING FINAL 5/18/2005 | $30.00 |
RESIDENTIAL ELECTRIC FEE | $111.72 |
MISCELLANOUS MECHANICAL FEES | $136.00 |
MISCELLANEOUS PLUMBING FEES | $232.00 |
BUILDING PERMIT FEE | $1,578.75 |
FENCE FEE | $20.00 |
PLUMBING TOP OUT 3/17/2005 G | $30.00 |
WATER METER 01/11/2005 JR | $30.00 |
PLUMBING FINAL 5/10/2005 | $30.00 |
1 INCH METER | $365.00 |
FLATWORK 1/24/2005 | $30.00 |
CREDIT CARD CONVENIENCE FEE | $4.60 |
CREDIT CARD CONVENIENCE FEE | $1.20 |
2NDS/FRAMING 3/22/2005 TW | $30.00 |
2NDS/FRAMING 3/30/2005 TW | $30.00 |
2NDS/FRAMING 4/4/2005 TW | $30.00 |
PLAN REVIEW FEE | $50.00 |
Total Fees: | $2,829.27 |
|
|
| ______ T-POLE |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ WATER METER |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ METER PAYMENT |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|