|
BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/12/2004
|
PERMIT SUB-TYPE: CNEW
|
PERMIT NO: B04-3580
|
JOB ADDRESS: 3865 PRESTON RD FRISCO, TX |
DESC:
35635 SQ FT, CNEW / 24 HR FITNESS (shell building) |
|
OWNER:
24 HR FITNESS
5100 BELTLINE RD #510 DALLAS TX
|
CONTRACTOR:
RAYMOND CONSTRUCTION - X 11
4407 N. BELTWOOD PKWY. SUITE 1 DALLAS TX 75244
|
ISSUED DATE: 6/24/2005
APPLIED DATE:10/6/2004
EXPIRED DATE:12/21/2005
SITE APN:C2582728
STATUS:COMPLETED
|
|
APPLICANT:
SMA & ARCHITECTS
115 W MAIN ST ALLEN TX 75013
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 1300000
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
2 INCH PD METER | $565.00 |
2 INCH TURB METER | $690.00 |
MECHANICAL FINAL 9/28/2005 S | $35.00 |
MISCELLANEOUS ELECTRICAL FEES | $923.80 |
MISCELLANOUS MECHANICAL FEES | $34.15 |
MISCELLANEOUS PLUMBING FEES | $140.00 |
COMMERCIAL BUILDING PERMIT FEE | $3,934.14 |
REVISION / ADDENDUM FEE | $350.00 |
Total Fees: | $6,672.09 |
|
|
| ______ PIER |
______ PIER |
______ SLAB |
______ CAMERA |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ ELECTRICAL |
______ SLAB |
______ SLAB |
______ SLAB |
______ SLAB |
______ WATER METER |
______ WATER METER |
______ FRAME |
______ T-POLE |
______ METER PAYMENT |
______ T-POLE |
______ SLAB |
______ FRAME |
______ PRE POUR INSP |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ SLAB |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ BRICK |
______ SLAB |
______ SLAB |
______ ELECTRICAL |
______ FRAME |
______ SLAB |
______ MECHANICAL |
______ INSULATION |
______ ELECTRICAL RELEASE |
______ ELECTRICAL |
______ MECHANICAL |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING ROUGH-IN |
______ PLUMBING TOP OUT |
______ ELECTRICAL RELEASE |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ PLUMBING ROUGH-IN |
______ ELECTRICAL |
______ D-STEEL |
______ CEILING |
______ CEILING |
______ ELECTRICAL |
______ CEILING |
______ ELECTRICAL FINAL |
______ CEILING |
______ CEILING |
______ GAS RELEASE |
______ GAS RELEASE |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ MECHANICAL FINAL |
______ PLUMBING FINAL |
______ MECHANICAL FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|