BUILDING
PERMIT
Inspections Line: 972.292.5386 cut-off at 4 PM the business day before
OR
Request Inspections online at https:\\etrakit.friscotexas.gov\etrakit until 7:00 AM same day
Contact assigned inspector for cancellation.
|
CITY OF FRISCO
6101 Frisco Square Blvd, TX 75034
Phone: 972.292.5301
|
APPROVED DATE: 10/18/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-3550
|
JOB ADDRESS: 3 SPLIT ROCK CT FRISCO, TX 75033 |
DESC:
3257 AC, 3969 SQ FT, SFR / 2 STORY |
|
OWNER:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
CONTRACTOR:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
ISSUED DATE: 11/3/2004
APPLIED DATE:9/30/2004
EXPIRED DATE:4/2/2005
SITE APN:ADD37946
STATUS:COMPLETED
|
|
APPLICANT:
BUESCHER HOMES
2591 DALLAS PWY #501 FRISCO TX 75034
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 243004.77
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
UTILITY / ROW 2/11/2005 GAS | $30.00 |
2NDS/FRAMING 12/14/2004 GLC | $30.00 |
2NDS/FRAMING 12/29/2004 GLC | $30.00 |
2NDS/FRAMING 1/4/2005 GLC | $30.00 |
RESIDENTIAL ELECTRIC FEE | $119.07 |
MISCELLANOUS MECHANICAL FEES | $123.00 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,713.75 |
FENCE FEE | $20.00 |
PLUMBING ROUGH-IN 1995/12/32 | $30.00 |
PLUMBING TOP OUT 12/7/2004 K | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
PLUMBING TOP OUT 1995/12/32 | $30.00 |
ELECTRICAL FINA 2/4/2005 | $30.00 |
ELECTRICAL FINA 2/7/2005 | $30.00 |
FLATWORK 2/7/2005 | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
ELECTRICAL FINA 2/9/2005 | $30.00 |
Total Fees: | $2,946.82 |
|
|
| ______ T-POLE |
______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ BRICK |
______ INSULATION |
______ BRICK |
______ DRY WALL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ FLATWORK |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ FLATWORK |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ ELECTRICAL FINAL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
______ BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|
(THIS IS A BASIC PERMIT VIEW ONLY)
|
|