APPROVED DATE: 10/16/2004
|
PERMIT SUB-TYPE: SNEW
|
PERMIT NO: B04-3056
|
JOB ADDRESS: 11445 MANSFIELD DR FRISCO, TX 75035 |
DESC:
2531 AC, 3159 SQ FT, SFR / 2 STORY |
|
OWNER:
Centex Homes
1660 S. Stemmons # 150 Lewisville, TX 75067
|
CONTRACTOR:
Centex Homes
1660 S. Stemmons # 150 Lewisville, TX 75067
|
ISSUED DATE: 10/28/2004
APPLIED DATE:9/9/2004
EXPIRED DATE:4/27/2005
SITE APN:C2519830
STATUS:COMPLETED
|
|
APPLICANT:
Centex Homes
1660 S. Stemmons # 150 Lewisville, TX 75067
|
LEGAL DESC:
COUNTY:
ZONING:
VALUATION: 188837.91
|
|
FEE SUMMARY
|
INSPECTION SUMMARY
|
1 INCH METER | $365.00 |
PLUMBING FINAL 3/9/2005 | $30.00 |
PLAN REVIEW FEE | $50.00 |
RESIDENTIAL ELECTRIC FEE | $94.77 |
MISCELLANOUS MECHANICAL FEES | $129.50 |
MISCELLANEOUS PLUMBING FEES | $211.00 |
BUILDING PERMIT FEE | $1,438.75 |
FENCE FEE | $20.00 |
UTILITY / ROW 2/28/2005 GAS | $30.00 |
2NDS/FRAMING 2/2/2005 GLC | $30.00 |
INSULATION 2/7/2005 GLC | $30.00 |
T-POLE 10/29/2004 GLQ | $30.00 |
PLUMBING ROUGH-IN 11/8/2004 | $30.00 |
PLUMBING ROUGH-IN 11/10/2004 | $30.00 |
WATER METER 11/01/2004 JR | $30.00 |
PLUMBING TOP OU 1/25/2005 | $30.00 |
PLUMBING TOP OUT 1/27/2005 K | $30.00 |
LAWNSPRINKLERSYSTEM | $35.00 |
Total Fees: | $2,644.02 |
|
|
| ______ T-POLE |
______ T-POLE |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ WATER METER |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ PLUMBING ROUGH-IN |
______ SLAB |
______ FLATWORK |
______ CAMERA |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ PLUMBING TOP OUT |
______ 2NDS/FRAMING |
______ 2NDS/FRAMING |
______ INSULATION |
______ BRICK |
______ INSULATION |
______ INSULATION |
______ DRY WALL |
______ UTILITY / ROW |
______ UTILITY / ROW |
______ PLUMBING FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ PLUMBING FINAL |
______ ELECTRICAL FINAL |
______ CO/BUILDING FINAL |
______ CO/BUILDING FINAL |
|
The project described shall be built in accordance with plans and specifications submitted at time of applications. All provisions of law and ordinances governing this type of work will be complied with whether specified or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. (The City will not assume responsibility for workability of sanitary sewer on all lots. NOTICE: A Certificate of Occupancy Must be Issued Before Any Building is Occupied.)
|